Project Update: Summer 2002

Project Status Pending

The second tier of this study of potential improvements to the bridge over the Columbia River between Hood River and White Salmon/Bingen is complete. During this phase of the study, the project team narrowed crossing improvement options from an initial set of 17 down to eight, and finally to three possible long-term alternatives. The project team, with guidance from advisory committee members, also identified recommended short and medium-term improvements.

A decision to conduct the third tier of the study is pending. If conducted, this third tier will evaluate the remaining long-term options in more detail and recommend a preferred alternative. It would result in a draft environmental impact statement summarizing possible impacts of a new bridge, as well as a financing plan to pay for it. Regional Administrators from the Oregon and Washington State Departments of Transportation currently are reviewing the results of the study to date. They will confer with other state transportation officials as they determine whether to continue the study. Their decision hinges in part on the ability of the two states and local communities to pay for long-term improvements. If the study does not proceed, construction of a new or significantly improved bridge is very unlikely during the next 20 years.

One winning entry from the bridge design contest for youth incorporated the clever addition of wind turbines - by Barry Claman (more details)

Alternatives Narrowed

The study made significant progress during the last several months as alternative locations for a new or improved bridge were reduced from three possible corridors to one. The remaining options are concentrated in the corridor near the existing bridge. Alternatives in the “East” and “City Center” corridors were eliminated from further study. This recommendation is based on technical analysis by the project team, review and discussion by the project’s Steering and Local Advisory Committees, and concurrence by regional administrators for the Oregon and Washington State Departments of Transportation.

Primary reasons for eliminating selected options from further study include:

East Corridor

This project is sponsored by the Southwest Regional Transportation Council and Oregon and Washington State Departments of Transportation in cooperation with the cities of Bingen, Hood River and White Salmon, and Hood River, Klickitat and Skamania Counties.

SR-35 Columbia River Crossing Study
Long-Term Alternatives

City Center Corridor

The three remaining alternatives are located near the existing bridge. All three tie into the existing bridge access road on the Oregon side near the existing toll booth. Two of the alternatives would touch down on the Washington side slightly east and west of the current bridge location. The other alternative would land on the Washington side approximately ¼ mile west of the existing bridge, intersecting with Dock Grade Road. Each remaining alternative would include facilities for autos/trucks, bicycles and pedestrians. In each case, the new bridge would be designed to allow river traffic to pass under the bridge without the need to raise and lower it, with no “lift span” or drawbridge section needed. More detailed evaluation and design of these alternatives may be conducted in a third phase of the study, if it moves forward (see page 1).

Short and Medium-Term Improvements Identified

In addition to narrowing the range of possible future long-term improvements, short and medium-term alternatives also have been identified and recommended by the project team and advisory committees. Both short and medium-term improvements would need to be implemented and funded by the agency having jurisdiction over the location being improved. Total estimated cost for these improvements is $2.7 million. Medium-term options would only be implemented if construction of a new bridge were at least 10 years in the future. Short and medium-term alternatives include:

Short-Term (one to five years)

SR-35 Columbia River Crossing Study
Short & Medium-Term Alternatives

Medium-Term (six to 10 years)

Cost and Financing of Improvements Evaluated

Results of the financial analysis include:
  • Residents favor user fees (e.g., tolls) over other financing methods such as property or other taxes.
  • Most residents would be willing to pay between $1.00 and $1.50 per trip to use a new bridge.
  • A $2.00 toll would generate the highest potential toll revenue. Higher tolls would discourage use of the bridge, lowering traffic and resulting in less money collected overall.
  • If higher tolls were phased in over the next 10 years, future toll revenues, collected over the next 30 years, could be expected to pay for about $50 million of the cost of the new bridge — 30 to 40%, depending on total costs.

The feasibility of replacing the current bridge will depend in large part on how much it will cost to build and the ability to finance it. Given other current and future statewide transportation needs and available resources in Oregon and Washington, some portion of a new bridge would have to be funded by local communities and residents. To help determine how much of the total cost of the bridge improvements could be funded locally, the project team studied the economic and financial feasibility of a new bridge, including:

Approximate costs of a new bridge were based on preliminary design concepts and typical construction costs for similar projects built elsewhere. Cost estimates for a new bridge range from $110 to $140 million for construction, design and construction administration. However, they do not include possible costs to address environmental impacts or right-of-way costs for land needed for bridge approaches and associated facilities. These items would increase the total estimated cost. Costs were identified for two different sized bridges. One would be approximately 65 feet wide and include three 12-foot-wide travel lanes, eight-foot-wide shoulders on both sides, and a 10-foot-wide bicycle/pedestrian lane on one side. A narrower, less costly bridge also is being considered. It would include two travel lanes, narrower shoulders on both sides, and a bicycle/pedestrian facility on one side.

The financial feasibility study incorporated the results of opinion polls of local residents and other bridge users who were asked about relative support for different ways to pay for bridge improvements, including willingness to pay specific toll amounts.

Adventure is the main attraction of this exciting bridge design contest entry, where skateboard ramp and car jump are integral. Slower vehicles will be glad for the safety net. - by Chase Young

Bridge Design Contest Sparks Creativity

(not all winners are pictured)

Kids on both sides of the river showcased their creative side when they participated in a contest co-sponsored by the White Salmon Enterprise, Hood River News and several local businesses, including Da Kine, Discover Bicycles, Hood River Outfitters, Hood River Parks and Recreation, McDonalds, Pietro’s Pizza and Wal-mart. The contest was open to youth between the ages of 5 and 18 in the Bingen, Hood River and White Salmon areas. Contestants submitted a great selection of creative entries. Recreation was a popular theme; several proposed bridge designs incorporated skate parks, fishing platforms and bungee jumping. One proposal harnessed the wind power of the Gorge with wind turbines above and below the bridge. Prizes were awarded to winning entries at a public open house in February, 2002. Congratulations to the following talented winners:

Want to Know More?

To find out more about the project and comment:

Questions or Comments?

E-mail or phone:

Dale Robins, Project Manager
Regional Transportation Council
1351 Officers Row, Vancouver WA 98661
Tel: 360-397-6067
Fax: 360-696-1847

Send mail to webmaster@rtc.wa.gov with questions or comments about this web site.
Copyright ©1992-2009, Regional Transportation Council, All Rights Reserved.